California Energy Commission (CEC)

ENERGY INNOVATIONS SMALL GRANT (EISG) PROGRAM

 

 

 

 


Short Summary

Improved Operational Turndown of an Ultra-low Emissions Gas Turbine Combustor

John Sullivan

99-13

 

EISG Project Title: Improved Operational Turndown of an Ultra-Low Emission Gas Turbine Combustor

EISG Grant Number: 99-13

PIER Area: Environmentally Preferred Advanced Generation

Principal Investigator: John Sullivan  

Contact Information: (408) 727-8282 jsulliva@alzeta.com

Organization: Alzeta Corporation

Grant Amount: $74,103

Grant Term: 12 Months

 

Project Description:

The purpose of this project is to research the feasibility of a new, lean-premix gas turbine combustor design that permits precise local control of the air-to-fuel ratio which improves the operating range of the combustor and significantly reduces NOx emissions.  The project includes fabrication and testing of up to 4 prototype combustor configurations and the development and testing of potential control strategies.

 

Proposed Outcomes: 

·        Prototype lean-premix gas turbine combustor capable of meeting targeted emissions levels.

·        Optimized fuel/air control strategy for prototype combustor.

 

Anticipated Benefits:

·        Reduce NOx, CO and hydrocarbon emissions in lean-premixed gas turbine combustors to 5 ppm, 10 ppm and 10 ppm, respectively. 

·        California relies heavily on gas turbines for electric generation and low emission gas turbines are expected to play a major role in distributed generation.

 

o    Full Project Summary

o    Statement of Work

o    Current Status

 

Index Page  EISG Program Page  Top